Skip to content

Khairay Footwear — Managed by Khairay Group

KhairayFootwear

The manufacturing journey

Six stages from your design to dispatch

The same route for every order. Your quotation sets out the timing for your project.

  1. Stage 1: Design submission

    Send your design, tech pack, reference photos or sample, with quantities and target market.

    You provide

    • Sketches, tech pack or reference photos (a physical sample helps most)
    • Target quantity per style and colour
    • Size range and target market
    • Target price range, if you have one

    We do

    • Acknowledge the enquiry and confirm what was received
    • Ask for anything missing before reviewing

    Decisions

    • OEM (your finished design), ODM (developed with us) or private label

    Affects cost and complexity

    • The more complete the brief, the fewer assumptions in the quotation

    Next: Your brief goes to technical and material review.

  2. Stage 2: Technical and material review

    We check construction, materials, sole and last options and flag anything that is not feasible.

    You provide

    • Answers to our technical questions
    • Material preferences, or approval of suggested alternatives

    We do

    • Review construction, last, sole unit and material availability
    • Flag anything that is not realistic at your price or quantity
    • Suggest stock components where they meet the brief

    Decisions

    • Existing or new last
    • Stock or custom outsole
    • Material grades and colours

    Affects cost and complexity

    • Custom lasts and outsole moulds
    • Specialist or slow-to-source materials

    Next: We prepare a written quotation and development plan.

  3. Stage 3: Quotation and development planning

    A written quotation covering unit price, MOQ, tooling, sample charges and the development plan.

    You provide

    • Agreement on the quotation and development plan
    • Logo artwork and packaging requirements

    We do

    • Quote unit price, MOQ, tooling and sample charges in writing
    • Set out the development plan and agreed delivery terms (Incoterms)

    Decisions

    • Order quantity and size split
    • Branding and packaging
    • Sample types required

    Affects cost and complexity

    • Quantity, colourways and size run
    • Tooling for lasts, moulds, dies and logos

    Next: Sample development starts once the quotation is accepted.

  4. Stage 4: Sample development and approval

    Proto, fit and size-set samples, refined with your written comments until a sample is approved.

    You provide

    • Written, photographed comments on each sample
    • Fit-test feedback on your core size
    • Final approval of the pre-production sample

    We do

    • Make samples on the agreed last and materials
    • Apply your comments in the next round
    • Record the approved sample and specification as the bulk standard

    Decisions

    • Fit, materials, colours and finish
    • Approval of the pre-production sample

    Affects cost and complexity

    • Each revision round adds time
    • New colours or materials after approval restart parts of sampling
    Sample types explained
    Proto sample
    Checks design, proportions and construction
    Fit sample
    Checks fit on the agreed last in your core size
    Size set
    Checks grading across the size run
    Salesman sample
    Final colours for selling, if needed
    Pre-production sample
    Approved as the standard for bulk

    Next: The approved sample becomes the reference for bulk production.

  5. Stage 5: Bulk manufacturing

    Materials are booked and pairs are cut, stitched, lasted, soled and finished to the approved sample.

    You provide

    • Order confirmation and size breakdown
    • Final packaging artwork and barcodes

    We do

    • Book materials and components
    • Cut, stitch, last, attach soles and finish
    • Run in-line checks at each stage

    Decisions

    • Any changes must be agreed in writing before production starts

    Affects cost and complexity

    • Material lead times
    • Changes after materials are booked

    Next: Finished pairs go to final inspection.

  6. Stage 6: Quality checks and dispatch

    Final inspection against the approved sample, then packing, labelling and dispatch on agreed terms.

    You provide

    • Shipping instructions and destination
    • Details of your inspection agency, if you use one

    We do

    • Inspect finished pairs against the approved sample
    • Pack, label and mark cartons to your specification
    • Prepare shipping documents for the agreed terms

    Decisions

    • Delivery terms and shipping method (agreed in the quotation)

    Affects cost and complexity

    • Shipping method and destination
    • Third-party inspection, if required

    Next: Goods ship. Repeat orders can start from the approved specification.

OEM, ODM and private label

Choose how much development you need

  • You have the design

    OEM

    You supply the design and specification; we produce to the approved sample.

    What we need: Tech pack or sample, materials list, size run

    OEM guide
  • You have an idea

    ODM

    We develop the design with you from a brief, mood board, references or one of our reference styles.

    What we need: Sketches or references, target price, target market

    ODM guide
  • You have a brand

    Private label

    Your brand on a developed style, with your labels, branding and packaging.

    What we need: Logo artwork, packaging needs, preferred styles

    Private-label branding

The manufacturing process

Twelve stages from first enquiry to shipment

Read the one-line summary of each stage, or open it for what happens, what you approve and what affects time. Which operations are carried out in-house and which with specialist partner workshops depends on the construction, and is confirmed for your project in the quotation.

Development

  1. 01Initial buyer inquiryYou send your design, references or a reference style, with quantities and market.

    What happens

    • Your RFQ and files are received and acknowledged
    • Missing information is requested before review

    You approve

    • Nothing yet: confirm the brief is complete

    Affects time

    • How complete the brief is
    • How quickly questions are answered
  2. 02Design and technical reviewConstruction, last, sole and materials are checked for feasibility at your price and quantity.

    What happens

    • Design reviewed for construction and components
    • Stock components identified where they meet the brief
    • Risks and unrealistic points flagged in writing

    You approve

    • Answers to technical questions
    • Any proposed changes to the design

    Affects time

    • Design complexity
    • Whether new tooling is needed
  3. 03Material and component selectionUpper materials, linings, soles, trims and hardware are chosen and swatched.

    What happens

    • Materials sourced to specification
    • Swatches and colour references prepared
    • Supplier minimums and lead times checked

    You approve

    • Material swatches and colours
    • Any substitutions

    Affects time

    • Material availability
    • Custom colours or specialist materials

    What is controlled

    • Colour, thickness and grain against approved swatches
    • Supplier minimums per colour
    • Restricted-substance requirements for your market
  4. 04Last and pattern developmentThe last sets fit; the pattern turns the design into cut pieces graded across sizes.

    What happens

    • Existing last selected, or a new last developed
    • Design lines drawn on the taped last and flattened into pattern pieces
    • Pattern graded across the size run

    You approve

    • Last choice and toe shape
    • Fit base for your market

    Affects time

    • New last versus existing last
    • Number of size groups and fittings

    What is controlled

    • Length, girth and toe shape for your market
    • Panel lines, eyelet positions and collar height
    • Allowances for lasting, folding and overlaps
  5. 05Sample costing and developmentSample charges and the development plan are quoted, then the first samples are made.

    What happens

    • Sample and tooling charges quoted in writing
    • Proto sample made on the agreed last and materials

    You approve

    • Sample charges and development plan
    • Start of sampling

    Affects time

    • Tooling needed for samples
    • Material arrival for sampling
  6. 06Prototype evaluation and revisionsPrototypes are reviewed, fit-tested and corrected until a pre-production sample is approved.

    What happens

    • Your written and photographed comments applied in each round
    • Fit sample and size set checked
    • Approved sample and specification recorded as the bulk standard

    You approve

    • Each sample round
    • The pre-production sample (sealed standard)

    Affects time

    • Number of revision rounds
    • Design changes between rounds

Production

  1. 07Bulk production planningThe order is confirmed, materials are booked and production is scheduled.

    What happens

    • Order and size breakdown confirmed
    • Materials and components booked
    • Production schedule set out in the order confirmation

    You approve

    • Order confirmation
    • Final packaging artwork and barcodes

    Affects time

    • Material lead times
    • Order size and colour split
    • Changes after materials are booked
  2. 08Material preparation and cuttingMaterials are inspected and upper components cut by die or by hand.

    What happens

    • Incoming materials inspected
    • Components cut with attention to hide quality and stretch
    • Pieces matched in pairs

    You approve

    • Nothing new: production follows the approved sample

    Affects time

    • Material arrival
    • Number of components per pair

    What is controlled

    • Best leather areas for visible panels
    • Stretch direction along the shoe
    • Left and right pieces matched for colour and texture
  3. 09Upper stitching and assemblyComponents are skived, folded, reinforced and stitched into finished uppers (closing).

    What happens

    • Edges skived and folded
    • Reinforcements and linings attached
    • Uppers stitched and checked in line

    You approve

    • Nothing new

    Affects time

    • Number of panels and stitch lines
    • Decorative stitching and embroidery

    What is controlled

    • Stitch length, tension and alignment
    • Reinforcement at eyelets and stress points
    • Clean seam ends and edges
  4. 10Lasting and sole attachmentUppers are pulled over the last, then the sole is cemented, stitched or moulded on.

    What happens

    • Upper lasted to the insole board
    • Sole and upper surfaces prepared
    • Sole attached by the agreed construction

    You approve

    • Nothing new

    Affects time

    • Construction method (cemented, stitched, injected or vulcanised)
    • Sole availability

    What is controlled

    • Even tension and symmetric toe and heel
    • Toe puff and heel counter correctly placed
    • Surface roughing and priming before bonding
    • No open bond lines or adhesive marks

Delivery

  1. 11Finishing and quality inspectionShoes are cleaned, finished and inspected against the approved sample.

    What happens

    • Last removed, sock liners and laces fitted
    • Cleaning and finishing
    • Final inspection; your inspection agency can attend

    You approve

    • Inspection results, if you use a third-party agency

    Affects time

    • Finishing complexity
    • Third-party inspection booking

    What is controlled

    • Pairing, symmetry and size marking
    • Bonding, stitching and finish
    • Key measurements per size
  2. 12Packaging and shipmentPairs are boxed, labelled and packed into marked cartons, and shipped on agreed terms.

    What happens

    • Boxing, labelling and carton packing
    • Shipping documents prepared
    • Goods handed over on the agreed Incoterms

    You approve

    • Shipping instructions
    • Shipping documents

    Affects time

    • Shipping method and destination
    • Packaging supply

    What is controlled

    • Box labels and barcodes
    • Carton assortment and shipping marks
    • Your branded packaging and inserts

Materials and customisation

Materials, constructions and branding

General options across our categories. Each reference style page lists the materials and constructions suited to that style, and availability is confirmed in your quotation.

Upper materials

Upper materials
MaterialTypical useNotes
Full-grain and corrected-grain leatherCasual, formal, bootsDurable and shapes to the foot; grade and finish affect price
Suede and nubuckCasual, sneakers, bootsSoft, matt surface; needs care with colour matching
Synthetic leather and microfibreSneakers, casual, motorsportConsistent and lighter; quality varies widely by grade
Mesh, knit and technical textilesRunning, lightweight sneakersBreathable and light; knit uppers need specialist partners
Canvas and woven textilesVulcanised and casual shoesLight and economical; print and colour flexibility
Rubber and EVA (moulded)Flip-flops and slippersFootbed and strap moulded or cut from sheet

Sole materials

Sole materials compared
MaterialFeelWearWeight
RubberFirm, grippyExcellentHeavier
EVASoft, cushionedModerateVery light
PUFirm-cushionedGoodMedium
TPUHardExcellentMedium
CrepeSoft, springyModerateMedium
LeatherFirm, classicModerateMedium

Construction methods

Footwear construction methods
ConstructionHow it worksTypical footwear
CementedSole bonded to the lasted upper with adhesiveMost casual and fashion shoes
StrobelUpper stitched to a fabric sock, sole cementedSneakers and flexible shoes
Cupsole (stitched or cemented)Upper set into a moulded rubber cup soleCourt, lifestyle and high-top sneakers
VulcanisedRubber cured onto the upper with heat and pressureCanvas and skate-style shoes
BlakeUpper, insole and sole stitched through from insideLightweight formal shoes
Goodyear weltedWelt stitched to upper and insole, sole stitched to weltFormal shoes and boots
Moulded / direct-injectionSole moulded directly onto the upper or as one pieceFlip-flops, slippers, some boots

Construction availability depends on the style and is confirmed per project; some constructions are produced with specialist partner workshops.

Branding without new tooling

  • Printed or embossed insole logo
  • Woven or printed tongue and heel labels
  • Embroidered or printed logos on the upper
  • Branded box, tissue and swing tags

Branding that needs tooling

  • Logo moulded into the outsole (needs a mould)
  • Debossed metal or rubber badges (needs a die)
  • Custom-shaped TPU or rubber heel pieces
  • Custom eyelets, aglets or hardware

Colours, lasts and packaging are specified per style. Custom lasts, outsole moulds and logo dies are quoted separately before you commit.

Standard vs custom development

How much new development does your style need?

These are qualitative descriptions, not promised timelines. The schedule for your project is set out in the quotation.

Standard development

Starts from components that already exist. Usually fewer sample rounds and lower minimums.

  • Existing compatible last
  • Stock or existing outsole
  • Readily available materials and colours
  • Straightforward branding (insole, labels, packaging)
  • One or two sample revisions

Custom development

Needs new tooling or specialist work. Expect more sample rounds, tooling costs and higher minimums.

  • New last for your fit
  • Custom outsole mould in your design
  • Unusual construction or specialist components
  • Moulded branding or custom hardware
  • Several prototype revisions

Cost and production time

What affects cost, MOQ and production time

There is no single footwear price, MOQ or lead time. Your quotation states them for your style, with the options that would make it simpler.

Factors that affect cost and production time
FactorSimpler and fasterMore complex and longer
Product complexityFew panels, simple constructionMany panels, overlays, specialist construction
Material availabilityStocked materials and coloursSpecial grades, custom colours, long-lead materials
ToolingExisting last and stock soleNew last, custom outsole mould, logo dies
Colours and sizesOne or two colourways, core sizesMany colourways across a full size run
BrandingPrinted insole and labelsMoulded logos, custom hardware, special packaging
Sampling revisionsClear brief, one or two roundsDesign changes between rounds
Order quantityQuantity meets material and tooling minimumsBelow minimums: surcharges or stock components

What drives each part of your quotation

  • Sample costsSample charges depend on how much has to be made new.
    • Number of sample rounds and types
    • New lasts, sole moulds or dies needed for samples
    • Specialist materials bought in small quantities
  • MOQMinimums come from tooling, materials and set-up, not a fixed number.
    • Size-specific sole moulds and lasts
    • Material minimums per colour
    • Number of colourways and sizes
  • Lead timesTime depends on development, materials and order size.
    • Sample rounds before approval
    • Material and component lead times
    • Order quantity and production schedule
  • Custom toolingNew tooling adds cost and time but makes the product yours.
    • Custom lasts
    • Outsole moulds per size
    • Cutting dies, logo dies and moulded badges
  • Material sourcingStocked materials are faster and cheaper than special orders.
    • Stocked versus made-to-order materials
    • Custom colours and finishes
    • Supplier location and minimums
  • ComplexityMore parts and operations mean more cost and time.
    • Number of panels and overlays
    • Construction method
    • Protective or specialist components
  • BrandingPrinted branding is simple; moulded branding needs tooling.
    • Printed or embossed insoles and labels
    • Moulded outsole logos and badges
    • Custom packaging
  • QuantityLarger runs spread tooling and set-up costs.
    • Pairs per style and colour
    • Size breakdown
    • Repeat orders on the same specification
  • ShippingDelivery terms and method change landed cost and timing.
    • Incoterms (EXW, FOB, CIF, DAP, DDP)
    • Sea, air or courier
    • Destination duties and documents

Minimum order quantities come from size-specific tooling (lasts and sole moulds), material minimums per colour and production set-up. Using stock soles, existing lasts and fewer colourways is usually the quickest way to lower them.

Quality control

Checked against your approved sample at every stage

  1. 01

    Approved standard

    The approved pre-production sample and specification define what is correct.

  2. 02

    Material inspection

    Incoming leathers, textiles, soles and trims checked against approved swatches.

  3. 03

    In-line checks

    Cutting, stitching, lasting and sole attachment checked while production runs.

  4. 04

    Final inspection

    Finished pairs checked visually and against key measurements before packing.

  5. 05

    Testing where required

    Laboratory tests arranged through external laboratories for specific properties or markets.

What is checked
CheckWhat is inspected
StitchingStitch length, tension, alignment and seam ends
Bonding and sole attachmentBond lines, alignment, gaps and adhesive marks
MaterialsColour, thickness and grain against approved swatches
Size and fitLength and key measurements per size against the size set
FinishMarks, residue, thread ends, symmetry and pairing
PackagingBox labels, barcodes, carton assortment and marks

Shipping preparation

Packing, documents and delivery terms

  • Pairs wrapped, boxed and labelled to your specification
  • Barcodes and size labels supplied by you or prepared to your format
  • Export cartons with assortment and shipping marks for your warehouse
  • Commercial invoice, packing list and certificate of origin where required
  • Your nominated inspection agency can inspect before shipment
  • Samples are usually sent by international courier
Common Incoterms for footwear orders
TermWhat it means
EXWGoods made available at our premises; you arrange all transport
FOBDelivered on board at the port of export; you arrange onward freight
CIFFreight and insurance paid to the destination port
DAPDelivered to a named place; you handle import duties
DDPDelivered with duties paid, quoted only where feasible

Delivery terms are confirmed in each quotation (Incoterms® 2020).

FAQ

Manufacturing questions

What is your minimum order quantity?

There is no single footwear MOQ. It depends on the last, the sole (stock or custom mould), material minimums and colourways. Your MOQ is stated in the quotation, with options that would lower it.

How long does development and production take?

It depends on tooling, materials and the number of sample rounds. We do not publish a standard lead time; the schedule for your project is set out in the quotation.

Can you work from a reference shoe?

Yes, for fit, construction and quality level. We do not copy protected designs, distinctive trade dress, logos or trademarks.

Do I need a complete tech pack?

No. A tech pack speeds things up, but sketches, reference photos or a physical sample are enough to start. We ask for anything missing during the technical review.

Are samples charged?

Sample charges and payment terms are stated in the quotation before any sample work starts.

Can our own inspection agency check the goods?

Yes. Third-party inspection by your nominated agency can be arranged during production or before shipment.

Do you hold product certifications?

No certification is claimed. Laboratory testing can be arranged through external laboratories where your product or market requires it; certification is a separate process with an accredited body.

Are our designs kept confidential?

Yes. Your designs, patterns and tooling are used only for your orders.

Six-step quotation request

Ready to start? Send your design and requirements.

Tell us the style, size run, materials and branding. Questions adapt to the footwear type, and you can attach tech packs and reference photos.

  1. 01Buyer informationCompany and contact details
  2. 02Footwear requirementsCategory, materials and construction
  3. 03Quantity & sizingPairs, size system and size-by-colour matrix
  4. 04Sampling & developmentSamples, tech pack, files and packaging
  5. 05Shipping & commercialDestination, Incoterms, timing and price
  6. 06Review & submitCheck, confirm and send